Presentation Overview
Wednesday, MAY 6, 3:30PM-4:30PM
Nicollet Ballroom
This presentation is on Air Barrier key requirements for inspecting and installing building envelope materials. Attendees will learn what to look out for before, during, and after the air barrier is installed.
Learning Objectives:
- Preinstallation AVB substrate inspections
- Mock Up Suggestions and Preinstallation Meeting actions
- Quality Assurance and Quality Control of Installed materials
- Tips and Tricks for Installers and inspections

Matt Giambrone, OCP Contractors
Matt was born into the construction industry as his father successfully ran a masonry company in Cleveland, Ohio, for 35 years. Matt became an apprentice bricklayer in 2001, successfully completed training, and became a journeyman. In 2009, Matt studied blueprint reading and estimates by hand. In 2010, Matt became a Level 3 Certified ABAA installer in fluid-applied, self-adhered, and spray foam. With the passing of his father in 2013, Matt started at OCP Contractors, starting up their division 7 group. In 2016, Matt became the Chairman of the Contractors; a few years later, he became a Board of Director for the ABAA, and in 2021, Matt also became a member of the Executive Committee.
