The Key to a Successful Project: Preconstruction Building Enclosure Coordination Meetings
Wednesday May 8, 2:15pm – 3:15pm
Grand Ballroom
An air barrier is a system of materials designed to control the flow of air between conditioned and non-conditioned spaces. While air barriers have been incorporated into wall assemblies for decades, it is important to note that the building envelope includes all sides of the building, including the exterior walls, the lowest-level floor, and the roof or ceiling assembly. Once additional sides of a building are included the detail becomes a challenge because not only is there a transition between air barrier materials, but there are also different trades involved, and sequencing becomes important. This presentation will review the importance of a preconstruction coordination meeting in identifying material transition ownership and installation sequence. The presentation will review how the buy-out process of the sub-contractors can impact the air barrier detailing. The speaker will review case studies and lessons learned from the “by other” syndrome. The speaker will also identify potential gaps between trades that are likely to require further coordination.
Learning Objectives:
- The speaker will review the requirements and process of a coordination meeting.
- Identify how installation sequence impacts detailing and installation of building air barrier components.
- Learn about unique solutions to improve the construction of a continuous air barrier.
- Review air barrier transitions and the responsibility of multiple sub-trades and their impact on air barrier detailing.
Derek Ziese, P.E., BECxP, CxA+BE
Gale Associates, Inc., Towson MD
Mr. Ziese performs evaluations of building enclosure (roof, wall, window, and waterproofing) and structural systems, to include measure-up, defect documentation, and coordination and observation of field testing performed by Gale staff and others. He routinely develops engineering studies, reports, cost estimates, specifications, and drawings. He has extensive experience in conducting peer reviews and building enclosure commissioning services. He provides construction administration services, including review of submittals and shop drawings; attendance at pre-construction and progress meetings; review of requests for information, change order requests, and payment requests from the contractor; attendance and review of mock-ups and field testing; punch list evaluations; and project closeout.